Main Content

PERED DRI Technology

State of the art
 
The first PERED DRI plant started successfully (June 2017) in Shadegan City, Khouzestan Province of Iran. After many years of research and engineering activities, the first PERED DRI plant started without any problem and its result illustrated that future market belong to PERED technology. The product of this plant had metallization of more than 93%, and carbon content of more than 1.5%, Capacity of 75 ton per hour on the first day and consumption figures are excellent. After a short time capacity reached its designed value.
Shadegan PERED DRI was designed for producing 800,000 ton per year cold DRI, a Greenfield contract.
Image

 Main features of The PERED technology are:

·         fast reaching design capacity,
·         energy consumptions lower than the other technologies,
·         higher performance,
·         easy operation,
·         flexibility for all product mix and capacities, etc.
Other PERED DRI plants are going to be started until the end of this year. There are three other PERED DRI plants in IRAN. Some of them are under commissioning and some of them are at final step of erection.
Another PERED DRI plant in China is under construction.
New contracts in Iran and all over the worlds (Mega Modules) are under negotiation and it is expected that at least two new PERED DRI contracts will be finalized until the end of 2017.

MME OFFICES

Headquarters Germany

Tersteegenstraße. 10  
40474 Düsseldorf, Germany
Tel: +49 (0) 211 6999051-0 
Fax: +49 (0) 211 6999051-99 
Email: info@mme-co.de

 

MME GmbH

Managing Director

Mr. Jafar Sargheini

 

 

Branch Office Iran

Fourth Alley South Piroozan St,

Hormozan St, Shahrak Gharb Tehran – Iran
Tel: +98 21 88578983-7
Fax: +98 21 88575758
Email: info@mme-co.ir