MME supply its PERED@ technology and is in charge for the supply of core technological equipment for 0.8 MMTPY DRI plant

 

Brief Note PERED DRI Plant Performance in Miyaneh:

PERED DRI Plant in Miyaneh Steel Complex was successfully commissioned and started producing DRI since 5th September 2017. Metallization as high as 96% also achieved during first startup.

Since last three months .i.e. from January 2018 plant is being operated near to the rated capacity. Production rate was @ 95 to 104 T/Hr. Performance Guarantee Test also passed during this period.

Oxide pellet quality is below par with the standard DRI quality pellets. As the complete analysis of the pellets being used are not received from the client, only some parameters which are known are listed below.

 

Std.

Actual

Total Fe (%)

>67

65-66

CCS (Kg/Pellet)

>260

220-260

Even though the pellet quality was well below the standard, the Specific Consumption rate is near to the design values of PERED DRI Pellets.

 

Productivity

Product Quality

Avg. Specific Consumption

 

Avg. Production Rate (T/Hr)

Avg. Metn.  (%)

Avg. Carbon (%)

Water (m3/T)

NG (Gcal/T)

Power (kWh/T)

Actual Range During Normal Operation

95-104

92.5-94.5

1.3-1.9

0.8-0.9

2.45-2.55

102-112

Actual Avg. at Rated Condition

100

93.50

1.50

0.85

2.50

105.0

 

MME OFFICES

Headquarters Germany

Tersteegenstraße. 10  
40474 Düsseldorf, Germany
Tel: +49 (0) 211 6999051-0 
Fax: +49 (0) 211 6999051-99 
Email: info@mme-co.de

 

MME GmbH

Managing Director

Mr. Jafar Sargheini

 

 

Branch Office Iran

Fourth Alley South Piroozan St,

Hormozan St, Shahrak Gharb Tehran – Iran
Tel: +98 21 88578983-7
Fax: +98 21 88575758
Email: info@mme-co.ir