PERED Moves forward
PERED Technology for revamping will set a "World Record" with 5 meters reduction furnace producing 105 t/h with over 93% metallization
PERED move forward
Old 1970's Korf designed 5 meter DRI furnace module revamped and the production rate designed for 120 tons per hour with over 93% metallizazion, with achieved already at the first commissioning phase of 105 t/h. This engineering was done in house by PERED DRI technology team and executed by a consortium of MME with local company.
This will be a "Wolrd Record" with 5 meters reduciotn furnace producing 130 tons per hour. Client KSC has 3 similarplants and is eager to do the revamp for the next modules.
KSC own also PERED technology DRI plants which due to commission in the second half of 2015